Projects: Relevant Experience

Menzies Civil Australia works within a range of different sectors including Civil, Roads and Infrastructure. The Menzies Civil Australia management team was built around each member applying their expertise to generate a structure that covers all bases, thus opening opportunities to all available projects across Australia. Relevant experience within the team involved the following civil projects.

WORK WITH A TEAM YOU CAN TRUST

Lesmurdie – Drainage Upgrade

Project Duration: 6 weeks, July – Aug 2018


The Booligal Street Drainage upgrade for the shire of Kalamunda involved the upgrade of existing shire system and existing stormwater pits. This included:

  • The installation of 450mm and 600mm black max stormwater pipe. 
  • Excavation of new stormwater line entirely in rock. 
  • Stormwater management during live cut into stormwater pits
  • Traffic management, road restoration and confined excavation around residents and power authority assets.
  • Stakeholder Management and restoration of public open space following excavation.

Project Quantities

  • Installation of 200m of new stormwater system
  • Installation of new headwall for outflow into stream
  • Management of latent ground conditions
  • Excavation, removal and disposal of 300m3 of rock
  • 4 new points of connection into existing system
  • Completion of 8 new crossovers

Project Achievements

  • Stakeholder management
  • Live connections
  • Delivery of new stormwater system to the Shire of Kalamunda
  • No injuries
  • Full Delivery with no defects or reworks required

    Kenwich – Hardstand Construction

    Project Duration: 4 weeks, Jul – Aug 2018


    • Utilisation of Scrapers and Dozers to bulk out 6,000 cubic
    • Meters of fill from across a 30,000m2 construction pad
    • Proof rolling and compaction using twin rollers and water cart to consolidate placed fill from previous stage of Works
    • Balance construction site ready for importation of subbase
    • Import, place and compact 9,000 tonnes of limestone over 30,000m2 at 150mm thick
    • Final trim using GPS grader to within 10mm for concrete Hardstand
    • Dewatering of moisture layer trapped in previous stage of Sand fill
    • Management of latent ground conditions for delivery of Hardstand ready for concrete prior to programmed dates
    • Management of 3,000 tonnes of limestone delivery per day over a three-day period

      Project Quantities

      • 30,000m2 of final trimming sand fill
      • Important, place and compact 9,000 tonnes of limestone
      • Delivery of QA package in accordance with
      • Engineers specifications
      • Management of latent ground conditions
      • Final trim of 30,000m2 of limestone hardstand to concrete tolerances

        Project Achievements

        • Working on high level construction site
        • Management of specialised dewatering system and latent ground conditions
        • No injuries
        • Full Delivery with no defects or reworks required

            Woodman’s Point – Contaminated Soil Removal

            Project Duration: 2 weeks, July 2018


            • Carry out testing of water corporation waste, “Sludge Analysis”
            • Utilised specialised team to re classify the sludge to the benefit of the client
            • Prepare haul road for load out of contaminated spoil
            • Bulk excavation and controlled removal of contaminated spoil via semi-trucks to designated location.
            • Management of quality and safety on a Water Corporation site
            • Tidy up area on completion

              Project Quantities

              • Export 2,000m3 of contaminated spoil
              • Management of 12 haulage trucks on busy
              • Water Corporation construction site
              • Management of latent ground conditions
              • Testing and management of contaminated spoil

                Project Achievements

                • Working on high level Water Corporation site
                • Management of contaminated spoil with no incidents
                • No injuries
                • Full Delivery with no defects or reworks required

                    Shenton Park – Restoration

                    Project Duration: Jan - Apr 2018


                    Menzies delivered the full civil restoration works and quality assurance for the main Water Corporation pumping station in Perth. The first stage of this restoration project involved the backfill of a sewer main, before Menzies Civil could commence road restoration works. This included the installation of footpaths, kerbs and asphalt and the overlay of existing carparks. As well as the installation of limestone retaining walls and stormwater drainage.

                    Menzies Civil achieved the full contract with a large increase in scope, within the timeframe allowed by RCR and Water Corporation. A challenging project to manage while working in close proximity to the new pump station and exclusion zones. Menzies was successful in overcoming the close working environment amongst all the other sub-contractors on site, to aid in the delivery of a first-class pumping station.

                        Project Quantities

                        • 3,000m2 of asphalt roadways
                        • Cart and disposal of 600m3 of C&D waste
                        • Demolition of sewer mains and pits
                        • 600m of kerbing
                        • Utilisation of 1,000m3 of onsite fill

                            Project Achievements

                            • Working on high level Water Corporation site
                            • Collaboration with vastly different trades for the overall completion
                            • No injuries
                            • Full Delivery with no defects or reworks required

                                  BADGINGARRA – Windfarm

                                  Badgingarra – Windfarm

                                  Project Duration: 12 Months, Oct 2017 – Oct 2018


                                  • Complete construction of haul roads, material importation, excavation of detailed footings and construction of crane pads
                                  • Operation of Dump Trucks, Excavators and Graders to assist in the delivery of the new Badgingarra Windfarm from start through to finish
                                  • Drive in, Drive out away work with full workforce living away from home
                                  • Management of project and employees working from a distance and staying away from home for long periods of time

                                  Pinjarra – Contaminated Soil Removal

                                  Project Duration: 2 Weeks, May 2018


                                  • Carry out testing of water corporation waste, “Slude Anlaysis”
                                  • Contained contaminated spoil within the designated bund for full duration of project
                                  • Prepare haul road for load out of contaminated spoil
                                  • Bulk excavation and controlled removal of contaminated spoil
                                  • Via semi-trucks to designated location.
                                  • Management of quality and safety on a Water Corporation site.
                                  • Tidy up area on completion

                                      Project Quantities

                                      • Export 1,000m3 of contaminated spoil
                                      • Management of 12 haulage trucks on busy Water Corporation construction site
                                      • Management of latent ground conditions
                                      • Opening up of contaminated soil bags

                                          Project Achievements

                                          • Working on high level Water Corporation site
                                          • Management of contaminated spoil with no incidents
                                          • No injuries
                                          • Full Delivery with no defects or reworks required

                                                Byford Kfc – Civil Works

                                                Project Duration: 8 weeks, Oct – Nov 2017


                                                Forward Earthworks:


                                                • Cut to fill and import, place and compact of fill sand for site
                                                • Establishment and the enablement of all trades


                                                Civil Works:


                                                • Installation of new drainage system
                                                • Establishment, compaction and testing of building pad ready for

                                                • Remediation to existing retaining wall and construction of parts of new retaining wall

                                                • Import, place, compact and trim of subbase and basecourse for car park pavement works.

                                                • Completion of full car park and footpath works around the new KFC, including Asphalt, Kerbs, Concrete Footpaths, line marking

                                                • Removal and installation of new crossovers into the site from existing, live roads.


                                                Specialised Works:


                                                • Management of confined site and working amongst a number of trades within close proximity

                                                • Preparation and installation of traffic management plan for works

                                                • Involved with live roads

                                                Project Quantities

                                                • Final trim of 600m2 of building pads
                                                • Construct 1,500m2 of car park and footpaths
                                                • Installation of two new crossovers
                                                • Installation of full new drainage system for KFC

                                                  Project Achievements

                                                  • Achieving practical completion on time for KFC opening
                                                  • Delivery of crossovers sequentially on main roads to maintain operational site.
                                                  • No injuries
                                                  • Management of significant ground water with specialised equipment

                                                          MORRISON RD - 7 LOTS – Subdivision

                                                          Morrison Rd - 7 Lots – Subdivision

                                                          Works began early with this client providing savings in the preliminary phase raising changes to design that could be made to benefit our client from a practical construction point of view. Over $300,000 worth of savings were executed before the construction drawings were released.


                                                          This project involved an extensive storm water network including the installation of 27 stormtech cells, fuel tank installation for Puma Energy and the preparation and pour of 2 black oxide concrete drive through, for Fast Food outlets. Extremely satisfied client who is currently looking to open 2 months ahead of program.

                                                          Kostera Oval – Redevelopment

                                                          Works including the removal of 20,000m3 of existing unsuitable material and the import of 25,000m3 of sand and lawn sand for oval filling and over 1.5km of subsoil drainage.


                                                          Dylan, (Director & Project Manager of Menzies Civil Australia) built an excellent rapport with local stakeholders, taking it upon himself to ensure no complaints were not seen to and to ensure on completion of the project that all those involved, including local residents were happy from start to finish. Dylan managed this project of all the above quantities and every subcontractor involved, ensuring that standards did not drop when the work was not his own, these same standards and more are upheld with Menzies Civil Australia.

                                                          Queensway Rd – 60 Lots – Subdivision

                                                          Works involved bulk earthworks, installation of underground services including sewer, drainage, water, electrical, gas and communications. Supply and installation of retaining walls, construction of roads and footpaths and final lot trimming. As well as interface with local residents, local school next to site and connection to current road.


                                                          Dylan, (Director & Project Manager of Menzies Civil) completed Queensway Road from beginning to end, securing and managing subcontractors, ensuring sub contracted work was completed to a standard that exceeded the clients’ expectations. Dylan has built an ongoing relationship with this client and has since been offered further work as a result of the service and quality provided with this previous project.

                                                          QUEENSWAY RD – 60 LOTS – Subdivision

                                                          Move Bulk Materials Across Your Worksite Easily With Menzies Civil Australia.

                                                          Dig More Efficiency with our Wheeled Loaders.

                                                          © 2021 Menzies Civil Australia

                                                          Get a free quote by filling out the online form below or speak with a member of our team now by calling (08) 7079 5687.